Project Details
We are currently working closely with our client on a phased refurbishment project in Wantage, delivering the improvements required to ensure the site is suitable for continued HGV use while providing safe, durable areas for staff and visitors.
Our experienced site and office teams work together throughout every stage of the project, carefully planning and phasing the works around the requirements of the live site.
Our Approach
Refurbishment projects often require much more than simply resurfacing an existing area. Our team has the experience to identify and manage the preparation works required to achieve the right finished result.
As part of this project, our works include:
Full site planning and phasing
Preparation and excavation works
Profile planing of existing surfaces
Adjusting levels to suit the finished design
Drainage works and improvements
Ground preparation and stonework
Surfacing and finishing works
Coordinating works around the client’s ongoing operations
By managing these elements as part of one coordinated package, we can ensure each phase is prepared correctly before moving on to the next.
The Result
The project is being delivered across multiple phases, allowing the site to remain operational while improvements are carried out.
Our aim is to provide a robust and practical finished solution that can withstand regular HGV traffic, improve the condition of the existing roads and car parks, and create safer areas for everyone using the site.
From the initial planning and preparation through to the final surfacing, our team is able to manage the complete refurbishment process — working closely with the client to deliver a solution that is right for the site.